O MY Luve 's like a red, red rose
That 's newly sprung in June:
O my Luve 's like the melodie
That's sweetly play'd in tune!
As fair art thou, my bonnie lass,
So deep in luve am I:
And I will luve thee still, my dear,
Till a' the seas gang dry:
Till a' the seas gang dry, my dear,
And the rocks melt wi' the sun;
I will luve thee still, my dear,
While the sands o' life shall run.
And fare thee weel, my only Luve,
And fare thee weel a while!
And I will come again, my Luve,
Tho' it were ten thousand mile
Sunday, May 8, 2011
Spring by Gerard Manley Hopkins
Nothing is so beautiful as spring—
When weeds, in wheels, shoot long and lovely and lush;
Thrush’s eggs look little low heavens, and thrush
Through the echoing timber does so rinse and wring
The ear, it strikes like lightnings to hear him sing;
The glassy peartree leaves and blooms, they brush
The descending blue; that blue is all in a rush
With richness; the racing lambs too have fair their fling.
When weeds, in wheels, shoot long and lovely and lush;
Thrush’s eggs look little low heavens, and thrush
Through the echoing timber does so rinse and wring
The ear, it strikes like lightnings to hear him sing;
The glassy peartree leaves and blooms, they brush
The descending blue; that blue is all in a rush
With richness; the racing lambs too have fair their fling.
What is all this juice and all this joy?
A strain of the earth’s sweet being in the beginning
In Eden garden.—Have, get, before it cloy,
Before it cloud, Christ, lord, and sour with sinning,
Innocent mind and Mayday in girl and boy,
Most, O maid’s child, thy choice and worthy the winning.
A strain of the earth’s sweet being in the beginning
In Eden garden.—Have, get, before it cloy,
Before it cloud, Christ, lord, and sour with sinning,
Innocent mind and Mayday in girl and boy,
Most, O maid’s child, thy choice and worthy the winning.
Thursday, May 5, 2011
Love Should Grow up like a Wild Iris in the Fields by Susan Griffin
Love Should Grow Up Like a Wild Iris in the Fields
Love should grow up like a wild iris in the fields,
unexpected, after a terrible storm, opening a purple
mouth to the rain, with not a thought to the future,
ignorant of the grass and the graveyard of leaves
around, forgetting its own beginning.
Love should grow like a wild iris
but does not.
Love shouldunexpected, after a terrible storm, opening a purple
mouth to the rain, with not a thought to the future,
ignorant of the grass and the graveyard of leaves
around, forgetting its own beginning.
Love should grow like a wild iris
but does not.
grow up like a wild iris, but doesn't, it comes from
the midst of everything else, sees like the iris
of an eye, when the light is right,
feels in blindness and when there is nothing else is
tender, blinks, and opens
face up to the skies
Wind Sounds
Night Sounds by Carolyn Kizer
The moonlight on my bed keeps me awake;
Living alone now, aware of the voices of evening,
A child weeping at nightmares, the faint love-cries of a woman,
Everything tinged by terror or nostalgia.
No heavy, impassive back to nudge with one foot
While coaxing, "Wake up and hold me,"
When the moon's creamy beauty is transformed
Into a map of impersonal desolation.
.
But, restless in this mock dawn of moonlight.
That so chills the spirit, I alter our history:
You were never able to lie quite peacefully at my side,
Not the night through. Always withholding something.
Awake before morning, restless and uneasy,
Trying not to disturb me, you would leave my bed
While I lay there rigidly, feigning sleep.
Still - the night was nearly over, the light not as cold
As a full cup of moonlight.
And there were the lovely times when, to the skies' cold No
You cried to me, Yes! Impaled me with affirmation.
Now, when I call out in fear, not in love, there is no answer.
Nothing speaks in the dark but the distant voices,
A child with the moon on his face, a dog's hollow cadence.
Living alone now, aware of the voices of evening,
A child weeping at nightmares, the faint love-cries of a woman,
Everything tinged by terror or nostalgia.
No heavy, impassive back to nudge with one foot
While coaxing, "Wake up and hold me,"
When the moon's creamy beauty is transformed
Into a map of impersonal desolation.
.
But, restless in this mock dawn of moonlight.
That so chills the spirit, I alter our history:
You were never able to lie quite peacefully at my side,
Not the night through. Always withholding something.
Awake before morning, restless and uneasy,
Trying not to disturb me, you would leave my bed
While I lay there rigidly, feigning sleep.
Still - the night was nearly over, the light not as cold
As a full cup of moonlight.
And there were the lovely times when, to the skies' cold No
You cried to me, Yes! Impaled me with affirmation.
Now, when I call out in fear, not in love, there is no answer.
Nothing speaks in the dark but the distant voices,
A child with the moon on his face, a dog's hollow cadence.
Night_Sounds
To -("Music, When Soft Voices Die") by Percy Bysshe Shelley
live within the sense they quicken.
Rose leaves, when the rose is dead,
Are heaped for the beloved's bed;
And so thy thoughts, when thou art gone,
Love itself shall slumber on
Rose leaves, when the rose is dead,
Are heaped for the beloved's bed;
And so thy thoughts, when thou art gone,
Love itself shall slumber on
Wednesday, May 4, 2011
The Life of Trees by Dorianne Laux
The pines rub their great noise
into the spangled dark, scratch
their itchy boughs against the house,
that moan’s mystery translates roughly
between my teeth, cut
those suckers down. What's reality
if not a long exhaustive cringe
from the blade, the teeth. I want to sleep
and dream the life of trees, beings
from the muted world who care
nothing for Money, Politics, Power,
Will or Right, who want little from the night
but a few dead stars going dim, a white owl
lifting from their limbs, who want only
to sink their roots into the wet ground
and terrify the worms or shake
their bleary heads like fashion models
or old hippies. If trees could speak,
they wouldn't, only hum some low
green note, roll their pinecones
down the empty streets and blame it,
with a shrug, on the cold wind.
During the day they sleep inside
their furry bark, clouds shredding
like ancient lace above their crowns.
Sun. Rain. Snow. Wind. They fear
nothing but the Hurricane, and Fire,
that whipped bully who rises up
and becomes his own dead father.
In the storms the young ones
bend and bend and the old know
they may not make it, go down
with the power lines sparking,
broken at the trunk. They fling
their branches, forked sacrifice
to the beaten earth. They do not pray.
If they make a sound it's eaten
by the wind. And though the stars
return they do not offer thanks, only
ooze a sticky sap from their roundish
concentric wounds, clap the water
from their needles, straighten their spines
and breathe, and breathe again.
Rain_Forest_Sounds
into the spangled dark, scratch
their itchy boughs against the house,
that moan’s mystery translates roughly
to drag the ladder from the shed,
climb onto the roof with a saw between my teeth, cut
those suckers down. What's reality
if not a long exhaustive cringe
from the blade, the teeth. I want to sleep
and dream the life of trees, beings
from the muted world who care
nothing for Money, Politics, Power,
Will or Right, who want little from the night
but a few dead stars going dim, a white owl
lifting from their limbs, who want only
to sink their roots into the wet ground
and terrify the worms or shake
their bleary heads like fashion models
or old hippies. If trees could speak,
they wouldn't, only hum some low
green note, roll their pinecones
down the empty streets and blame it,
with a shrug, on the cold wind.
During the day they sleep inside
their furry bark, clouds shredding
like ancient lace above their crowns.
Sun. Rain. Snow. Wind. They fear
nothing but the Hurricane, and Fire,
that whipped bully who rises up
and becomes his own dead father.
In the storms the young ones
bend and bend and the old know
they may not make it, go down
with the power lines sparking,
broken at the trunk. They fling
their branches, forked sacrifice
to the beaten earth. They do not pray.
If they make a sound it's eaten
by the wind. And though the stars
return they do not offer thanks, only
ooze a sticky sap from their roundish
concentric wounds, clap the water
from their needles, straighten their spines
and breathe, and breathe again.
Rain_Forest_Sounds
Tuesday, May 3, 2011
Eagle Poem by Joy Harjo
Eagle Poem
To pray you open your whole self
To sky, to earth, to sun, to moon
To one whole voice that is you.
And know there is more
That you can't see, can't hear
Can't know except in moments
Steadily growing, and in languages
That aren't always sound but other
Circles of motion.
Like eagle that Sunday morning
Over Salt River. Circles in blue sky
In wind, swept our hearts clean
With sacred wings.
We see you, see ourselves and know
That we must take the utmost care
And kindness in all things.
Breathe in, knowing we are made of
All this, and breathe, knowing
We are truly blessed because we
Were born, and die soon, within a
True circle of motion,
Like eagle rounding out the morning
Inside us.
We pray that it will be done
In beauty.
In beauty
To sky, to earth, to sun, to moon
To one whole voice that is you.
And know there is more
That you can't see, can't hear
Can't know except in moments
Steadily growing, and in languages
That aren't always sound but other
Circles of motion.
Like eagle that Sunday morning
Over Salt River. Circles in blue sky
In wind, swept our hearts clean
With sacred wings.
We see you, see ourselves and know
That we must take the utmost care
And kindness in all things.
Breathe in, knowing we are made of
All this, and breathe, knowing
We are truly blessed because we
Were born, and die soon, within a
True circle of motion,
Like eagle rounding out the morning
Inside us.
We pray that it will be done
In beauty.
In beauty
Stopping by Woods on a Snowy Evening
Whose woods these are I think I know.
His house is in the village though;
He will not see me stopping here
To watch his woods fill up with snow.
My little horse must think it queer
To stop without a farmhouse near
Between the woods and frozen lake
The darkest evening of the year.
He gives his harness bells a shake
To ask if there is some mistake.
The only other sound's the sweep
Of easy wind and downy flake.
The woods are lovely, dark and deep.
But I have promises to keep,
And miles to go before I sleep,
And miles to go before I sleep.
His house is in the village though;
He will not see me stopping here
To watch his woods fill up with snow.
My little horse must think it queer
To stop without a farmhouse near
Between the woods and frozen lake
The darkest evening of the year.
He gives his harness bells a shake
To ask if there is some mistake.
The only other sound's the sweep
Of easy wind and downy flake.
The woods are lovely, dark and deep.
But I have promises to keep,
And miles to go before I sleep,
And miles to go before I sleep.
Where I Come From by Elizabeth Brewster
People are made of places. They carry with them
hints of jungles or mountains, a tropic grace
or the cool eyes of sea gazers. Atmosphere of cities
how different drops from them, like the smell of smog
or the almost-not-smell of tulips in the spring,
nature tidily plotted with a guidebook;
or the smell of work, glue factories maybe,
chromium-plated offices; smell of subways
crowded at rush hours.
Where I come from, people
carry woods in their minds, acres of pine woods;
blueberry patches in the burned-out bush;
wooden farmhouses, old, in need of paint,
with yards where hens and chickens circle about,
clucking aimlessly; battered schoolhouses
behind which violets grow. Spring and winter
are the mind's chief seasons: ice and the breaking of ice.
A door in the mind blows open, and there blows
a frosty wind from fields of snow.
hints of jungles or mountains, a tropic grace
or the cool eyes of sea gazers. Atmosphere of cities
how different drops from them, like the smell of smog
or the almost-not-smell of tulips in the spring,
nature tidily plotted with a guidebook;
or the smell of work, glue factories maybe,
chromium-plated offices; smell of subways
crowded at rush hours.
Where I come from, people
carry woods in their minds, acres of pine woods;
blueberry patches in the burned-out bush;
wooden farmhouses, old, in need of paint,
with yards where hens and chickens circle about,
clucking aimlessly; battered schoolhouses
behind which violets grow. Spring and winter
are the mind's chief seasons: ice and the breaking of ice.
A door in the mind blows open, and there blows
a frosty wind from fields of snow.
Monday, May 2, 2011
Because I Could Not Stop for Death
Because I could not stop for Death,
He kindly stopped for me;
The carriage held but just ourselves
And Immortality.
He kindly stopped for me;
The carriage held but just ourselves
And Immortality.
We slowly drove, he knew no haste,
And I had put away
My labor, and my leisure too,
For his civility.
And I had put away
My labor, and my leisure too,
For his civility.
We passed the school, where children strove
At recess, in the ring;
We passed the fields of gazing grain,
We passed the setting sun.
At recess, in the ring;
We passed the fields of gazing grain,
We passed the setting sun.
Or rather, he passed us;
The dews grew quivering and chill,
For only gossamer my gown,
My tippet only tulle.
The dews grew quivering and chill,
For only gossamer my gown,
My tippet only tulle.
We paused before a house that seemed
A swelling of the ground;
The roof was scarcely visible,
The cornice but a mound.
A swelling of the ground;
The roof was scarcely visible,
The cornice but a mound.
Since then 'tis centuries, and yet each
Feels shorter than the day
I first surmised the horses' heads
Were toward eternity.
Feels shorter than the day
I first surmised the horses' heads
Were toward eternity.
Sunday, May 1, 2011
Anthem for Doomed Youth
What passing-bells for these who die as cattle?
-- Only the monstrous anger of the guns.
Only the stuttering rifles' rapid rattle
Can patter out their hasty orisons.
No mockeries now for them; no prayers nor bells;Nor any voice of mourning save the choirs, --
The shrill, demented choirs of wailing shells;
And bugles calling for them from sad shires.
What candles may be held to speed them all?
Not in the hands of boys but in their eyes
Shall shine the holy glimmers of goodbyes.
The pallor of girls' brows shall be their pall;
Their flowers the tenderness of patient minds,
And each slow dusk a drawing-down of blinds
What passing-bells for these who die as cattle?
-- Only the monstrous anger of the guns.
Only the stuttering rifles' rapid rattle
Can patter out their hasty orisons.
No mockeries now for them; no prayers nor bells;Nor any voice of mourning save the choirs, --
The shrill, demented choirs of wailing shells;
And bugles calling for them from sad shires.
What candles may be held to speed them all?
Not in the hands of boys but in their eyes
Shall shine the holy glimmers of goodbyes.
The pallor of girls' brows shall be their pall;
Their flowers the tenderness of patient minds,
And each slow dusk a drawing-down of blinds
Here a Pretty Baby Lies by Robert Herrick
Here a pretty baby lies
Sung asleep with Lullabies:
Pray be silent, and not stir
Theasy earth that covers her.
Subscribe to:
Posts (Atom)